The Building Safety Levy came into effect on 1 October 2026.
The Building Safety Levy is a tax on new residential dwellings, collected by local authorities as part of the Building Regulations process. Once collected by local authorities it is paid to the central government to fund building safety remediation.
Which developments does the Building Safety Levy apply to?
The Building Safety Levy applies to major residential developments, which are defined as a development which results in 10 or more new dwellings, including change of use to residential.
Social housing (including shared ownership, First Homes and social rent) are excluded but will count towards the number of dwellings, so for example if a development comprises 15 dwellings, 7 of which are social housing, the Building Safety Levy will apply to the 8 private units.
Applications submitted before 1 October 2026 are not caught.
How is the Building Safety Levy calculated?
The Building Safety Levy is calculated on the square meterage of the new residential floorspace and the communal floorspace, with adjustments made if there is social housing. It is paid for the whole of a development, you cannot avoid it by phasing building control applications.
What are the Building Safety Levy rates?
The rates are set by the regulations for each authority. Rates are per square metre of floorspace and vary by location. Some example rates are below:
| Local Authority | Building Safety Levy per square metre | Previously developed land rate per square metre |
| Swindon | 27.06 | 13.53 |
| Wiltshire | 31.61 | 15.80 |
| Kensington and Chelsea | 100.35 | 50.17 |
| Surrey Heath | 46.78 | 23.39 |
You can find all of the rates here Building Safety Levy: Guidance – Section 2: Levy rates and calculations – Guidance – GOV.UK
Is there a Building Safety Levy discount for brownfield sites?
There is a 50% discount for developing brownfield sites, referred to in the regulations as ‘previously developed land’ (PDL).
PDL is defined as land which either has a building on it or had a building on it at any point on or after the 1 July 1948 but there are exclusions, including building that are or most recently were used for agriculture.
In order to qualify as PDL, at least 75% of the redline boundary of the development must be previously developed land.
You should consider obtaining evidence of this from the Seller during the purchase transaction if any buildings have been demolished.
All planning permissions granted via permitted development fall are classed as PDL.
How is the Building Safety Levy paid?
For most applications the process is as follows, depending on whether you are using the local authority for building control, or a third party.
| Local Authority Building Control | Registered Building Control Approver |
| Submit Building Regulations full plans with levy information | Submit Initial Notice with levy information |
| Submit commencement notice with further levy information | Submit commencement notice with further levy information |
| Local authority calculates the levy and issues a levy liability notice | Local authority calculates the levy and issues a levy liability notice |
| Developer pays levy | Developer pays levy |
| Developer notifies local authority works have been completed and confirms levy payment | Developer makes a compliance declaration to the RBCA following completion of the works |
| Local authority confirms payment has been made | RBCA issues final certificate and sends it to the local authority |
| Local authority issues completion certificate | The local authority will only accept the final certificate if the levy payment has been made |
The Building Safety Levy at any time between the levy liability notice being issued and notification of completion of the works.
Developers should bear in mind the time local authorities can take to allocate payments to avoid delays with the final certificate being issued or accepted.
Non-profit registered providers of social housing are exempt.
Practical steps for developers
- Build the levy into appraisals, viability assessments and cash-flow forecasts.
- Check the relevant local authority’s rate.
- Prioritise brownfield sites where possible.
- Provide levy information with building control applications, as omitting it is grounds for rejection.
- Ensure that payments are made in good time to avoid delays in Building Control Completion Certificates being issued or accepted.
Please note that this is general information, and is not intended to be legal advice. You should seek professional advice on your specific scheme.
Need practical, jargon-free advice on a land or development project?
If you require practical, jargon-free advice on the Building Safety Levy or any land or development project, please contact our Land & Development team.